Article ID Journal Published Year Pages File Type
861501 Procedia Engineering 2012 6 Pages PDF
Abstract

The tailings accident-prone and the method of hazards analysis and identification are highly valued by Canada, Australia, European Union and other countries. These accidents brought huge loss and a profound lesson such as the “9.8” dam break accident of Shan Xi's new tower, which reflected the limitations of our tailings management and the necessity of study. A method about Life cycle oriented hazards identification for tailings facility, and analyzed hazards of life cycle systematically from technical, human, environment and regulations, such as the unsafe state of tailings pond, the miscount of people, the deficiencies of management and the adverse conditions of environment, and the advice of accident disaster prevention measures for the corresponding life cycle stages was presented, the safety level of the tailing pond in China will be improved.

Related Topics
Physical Sciences and Engineering Engineering Engineering (General)