Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
862227 | Procedia Engineering | 2012 | 6 Pages |
Abstract
The paper put forward an optimizing calculation method to optimize the cable initial force of cable-stayed arch bridge while in arch rib cantilever erecting. The arch rib cantilever erection of cable-stayed arch bridge has the construction process of cable removal. It is different in cable-stayed bridge or arch bridge. Therefore common influence matrix cannot be used directly. And the optimizing method in the paper is developed by modifying influence matrix. Also the paper develops a program by using ANSYS APDL language. The program is applied in Lian-cheng Bridge. The calculation result is similar to sequential forward algorithm. Finally the arch rib enclosure deviation is within 5 mm. The whole arch curve meets the design request.
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)