Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
863594 | Procedia Engineering | 2011 | 16 Pages |
Abstract
On the basis of the preceding risk identification and the risk evaluation index systems, this paper applied AHP to determine the weight of risk evaluation indexes and fuzzy comprehensive evaluation to obtain the risk level under the condition of RNP technology operation into Nyingchi airport from the four aspects of human risk factor, equipment risk factor, environment risk factor and management risk factor. In order to improve the plateau flight safety, it made further efforts to put forward measures of risk control and prevention for plateau flight based on the risk evaluation results.
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)