Article ID Journal Published Year Pages File Type
8903358 Electronic Notes in Discrete Mathematics 2018 8 Pages PDF
Abstract
We developed a variable neighborhood search heuristic and a mixed integer programming model for the identical parallel machine scheduling problem with sequence dependent setup time. For this problem, we consider minimizing two objectives, which are the makespan and the flow time. The heuristic proposed has a constructive procedure to build initial solutions, five neighborhood structures, and a local search based on the variable neighborhood descent. Computational experiments indicate that the heuristic is very fast and can return better solutions than the model since it found 90% of the best solutions. It also outperformed all solutions computed with the longest processing time and the shortest processing time rules, both commonly adopted for scheduling problems.
Related Topics
Physical Sciences and Engineering Mathematics Discrete Mathematics and Combinatorics
Authors
, ,