Article ID Journal Published Year Pages File Type
9538030 Engineering Geology 2005 8 Pages PDF
Abstract
The basic foundation treatment of the dam consisted of consolidation grouting, a high-pressure grout curtain and a drainage curtain. Moreover, a 144 m high and 30 m wide concrete cutoff wall was built to prevent reservoir seepage through a clay-filled fracture zone in the right abutment. The grout curtain penetrates the “Principal Vuggy Zone” only beneath the central portion of the dam and below the cutoff wall. In the right abutment fan curtains were constructed to reduce drainage flows, but the seepage problem could not be solved. In order to determine the seepage direction and karstification pattern, hydrogeological studies have been carried out. Additional investigation boreholes have been drilled to monitor fluctuations in groundwater level. Besides these, water chemistry, dye tracer, pinhole and XRF tests have been carried out. As a result of these studies, seepage paths have been identified in the karstic limestone in the right abutment of the dam.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , ,