Article ID Journal Published Year Pages File Type
9638196 Fusion Engineering and Design 2005 5 Pages PDF
Abstract
Current reconstruction in cable-in-conduit conductors (CICC) cables is a crucial issue to determine cables performance in working conditions, and must be performed using inverse problem approaches as direct measurement is not feasible. The current distribution has been studied for the ITER Poloidal Field Insert Sample (PFIS) conductor using annular arrays of Hall probes placed in three different locations along the sample during the test campaign at the SULTAN facility. The measurement apparatus is also described in the paper, together with the approach to current reconstruction.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , , , , ,