Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
9638293 | Fusion Engineering and Design | 2005 | 5 Pages |
Abstract
This paper describes for each leak size type the procedures for maintaining save conditions in the vacuum vessel. It also presents the methods used at Tore Supra to drain-off the primary loop circuits and to identify the leaky PFC.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
F. Samaille, M. Chantant, D. van Houtte, J.J. Cordier, L. Gargiulo,