Article ID Journal Published Year Pages File Type
9638308 Fusion Engineering and Design 2005 4 Pages PDF
Abstract
These studies, performed between 2001 and 2003, led to a viable solution, with a reasonable cost, fully supported by the French authorities. The planning necessary to implement the road modifications is also fully compatible with the expected dates of ITER components delivery.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , ,