Article ID Journal Published Year Pages File Type
9638320 Fusion Engineering and Design 2005 5 Pages PDF
Abstract
The two identical cryopumps for IPP are foreseen to pump a hydrogen-throughput of 3 Pa m3/s (H2) with a pumping speed of 350 m3/s per pump. The pressure conditions must be maintained over 4 h pumping without regeneration of the cryopanels. For the ITER Neutral Beam Test Facility, design calculations to assess heat loads and pumping parameters of the cryopumps will be briefly described.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , , , , , , ,