9638360 Fusion Engineering and Design 2005 5 Pages PDF
Abstract
The performance analysis shows that during the period of JET operation under the EFDA contract, the NBI facility has successfully changed from high power-short pulse to high power-long pulse (10 s) operation. It also shows that the sources of unreliability and non-availability have largely remained constant during this change.