The planned growth in the EC system on DIII-D over the next few years requires the installation of two depressed collector gyrotrons, a high voltage power supply, two low loss transmission lines, and the required support equipment. This new DIII-D EC equipment could be made identical to the ITER EC system requirements. By building the DIII-D hardware to the ITER specifications, it will allow ITER to gain beneficial prototyping experience on a working tokamak, prior to committing to building the hardware for delivery to ITER.