Article ID Journal Published Year Pages File Type
9642985 Tunnelling and Underground Space Technology 2005 5 Pages PDF
Abstract
The paper will explain how the design team from Avrasyaconsult - the Employer's Representative - arrived at the final minimum, specific and functional requirements of the bored tunneling works which are to be carried out using the 'FIDIC EPC/Turnkey Project' conditions.
Keywords
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
,