Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10235513 | Process Biochemistry | 2012 | 7 Pages |
Abstract
⺠The IEMB was successfully operated in a plate-and-frame configuration. ⺠Stepwise increase of ethanol avoided permeation into the treated water stream. ⺠Biocompartment pH should be controlled to assure complete perchlorate removal. ⺠HCl allowed for pH adjustment and it delivered Clâ to be used as driving counter-ion.
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Bioengineering
Authors
Ana R. Ricardo, Svetlozar Velizarov, João G. Crespo, Maria A.M. Reis,