Article ID Journal Published Year Pages File Type
10347153 Computers & Operations Research 2012 13 Pages PDF
Abstract
► We study the single machine problem with quadratic earliness and tardiness costs. ► The problem, for the first time, is optimally solved for problems up to 30 jobs. ► Lower and upper bounds have higher efficiency in comparison with previous studies. ► The proposed heuristic method has an overall optimality gap less than 1.3 percent.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,