Article ID Journal Published Year Pages File Type
10347226 Computers & Operations Research 2011 6 Pages PDF
Abstract
In many realistic production situations, a job processed later consumes more time than the same job when it is processed earlier. Production scheduling in such an environment is known as scheduling with deteriorating jobs. However, research on scheduling problems with deteriorating jobs has rarely considered explicit (separable) setup time (cost). In this paper, we consider a single-machine scheduling problem with deteriorating jobs and setup times to minimize the maximum tardiness. We provide a branch-and-bound algorithm to solve this problem. Computational experiments show that the algorithm can solve instances up to 1000 jobs in reasonable time.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,