| Article ID | Journal | Published Year | Pages | File Type | 
|---|---|---|---|---|
| 10353350 | Computers in Industry | 2005 | 8 Pages | 
Abstract
												Despite the inter-dependent relationship between them, production scheduling and preventive maintenance planning decisions are generally analyzed and executed independently in real manufacturing systems. This practice is also found in the majority of the studies found in the relevant literature. In this paper, heuristics based on genetic algorithms are developed to solve an integrated optimization model for production scheduling and preventive maintenance planning. The numerical results on several problem sizes indicate that the proposed genetic algorithms are very efficient for optimizing the integrated problem.
											Related Topics
												
													Physical Sciences and Engineering
													Computer Science
													Computer Science Applications
												
											Authors
												N. Sortrakul, H.L. Nachtmann, C.R. Cassady, 
											