Article ID Journal Published Year Pages File Type
10390423 Applied Thermal Engineering 2014 11 Pages PDF
Abstract
The results show that the rescheduling technique is able to reduce the imbalance error (up to 90% depending on the season and the strategy). Additionally, the total operational cost is estimated. However, the nowadays imbalance prices only lead to a minor financial advantage that is unlikely to motivate real life operators to perform a rescheduling strategy.
Related Topics
Physical Sciences and Engineering Chemical Engineering Fluid Flow and Transfer Processes
Authors
, , ,