Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10487143 | Energy Policy | 2011 | 8 Pages |
Abstract
⺠We model life-cycle battery lead (Pb) losses for PV goals in China (2020) and India (2022). ⺠Base-case projected losses are 386 kt (China) and 2030 kt (India). ⺠Projected losses are equal to 1/3 of global lead production in 2009. ⺠The best-case scenario reduces losses by 47% (China) and 44% (India). ⺠Simultaneous investment needed in environmental controls and product stewardship.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Perry Gottesfeld, Christopher R. Cherry,