Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
10677675 | Applied Mathematical Modelling | 2015 | 10 Pages |
Abstract
Typical semiconductor production is re-entrant and hence requires priority decisions when parts compete for production capacity at the same machine. A standard way to run such a factory is to start to plan and to finish according to demand. Often this results in a push policy where early production steps have priority over later production steps at the beginning of the production line and a pull policy where later steps have priority at the end of the production line. The point where the policies switch is called the push-pull-point (PPP). We develop a control scheme based on moving the PPP in a continuum model of the production flow. We show that this control scheme significantly reduces the mismatch between demand and production output. The success of the control scheme as a function of the frequency of control action is analyzed and optimal times between control actions are determined.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics
Authors
Fenglan He, Dieter Armbruster, Michael Herty, Ming Dong,