Abstract
When scheduling projects under resource constraints, assumptions are typically made with respect to the resource availability and activities are planned each with its own duration and resource requirements. In resource scheduling, important assumptions are made with respect to the staffing requirements. Both problems are typically solved in a sequential manner leading to a suboptimal outcome. We integrate these two interrelated scheduling problems to determine the optimal personnel budget that minimises the overall cost. Integrating these problems increases the scheduling flexibility, which improves the overall performance. In addition, we consider some resource demand flexibility in this research as an activity can be performed in multiple modes. In this paper, we present an iterated local search procedure for the integrated multi-mode project scheduling and personnel staffing problem. Detailed computational experiments are presented to evaluate different decomposition heuristics and comparison is made with alternative optimisation techniques.
Keywords
Related Topics
Physical Sciences and Engineering
Computer Science
Computer Science (General)
Authors
M. Van Den Eeckhout, B. Maenhout, M. Vanhoucke,