Article ID Journal Published Year Pages File Type
1135518 Computers & Industrial Engineering 2009 6 Pages PDF
Abstract

This paper investigates the optimal production run length in deteriorating production processes, where the elapsed time until the production process shifts is characterized as a fuzzy variable, also the setup cost and the holding cost are characterized as fuzzy variables, respectively. A mathematical formula representing the expected average cost per unit time is derived, and some properties are obtained to establish an efficient solution procedure. Since there is no closed-form expression for the optimal production run length, an approximate solving approach is presented. Finally, two numerical examples are given to illustrate the procedure of searching the optimal solutions.

Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, ,