Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1568183 | Journal of Nuclear Materials | 2010 | 5 Pages |
Abstract
The Spallation Neutron Source (SNS) completed construction in June, 2006. Since then the power has been ramped up and by October, 2008 has reached 620Â kW with over 1200Â MW-h of energy delivered to the target. During this period the complement of neutron scattering instruments has increased from the original 3-6 operational and 13 in varying stages of planning or construction. This paper will discuss the power ramp up history and availability with an emphasis on the target system components and operating experience.
Related Topics
Physical Sciences and Engineering
Energy
Nuclear Energy and Engineering
Authors
T. McManamy,