Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1700353 | Procedia CIRP | 2014 | 6 Pages |
Abstract
This paper presents a mathematical model and an adaptation of the Strength Pareto Evolutionary Algorithm II (SPEA2) for the Mixed-Model Assembly Line balancing and equipment selection problem. The SPEA2 was enriched with a task and equipment reassignment procedure and aims at supporting the planners to find better solutions in the earliest phases of a production system planning project.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering