Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1703890 | Applied Mathematical Modelling | 2014 | 6 Pages |
Abstract
Chiu et al. (2010) [8] present the proof of convexity of the long-run average cost function E[TCU(t1)] for a manufacturing system with stochastic breakdown and rework process. This note not only demonstrates that E[TCU(t1)] is not convex but also adopts the rigorous methods of mathematics to develop the complete solution procedure to find the optimal solution for removing shortcomings of the above paper mentioned.
Related Topics
Physical Sciences and Engineering
Engineering
Computational Mechanics
Authors
Pin-Shou Ting, Kun-Jen Chung,