Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1846427 | Nuclear Physics B - Proceedings Supplements | 2011 | 6 Pages |
Abstract
One of the options for creating a Deep Underground Science and Engineering Laboratory (DUSEL) is a site in the Mt. Stuart batholith, a granodiorite and tonalite rock mass in the Cascade mountain range in Washington State. The batholithʼs 100-year history in hard-rock tunneling includes the construction of the longest and deepest tunnels in the U.S., the parallel Cascade and Pioneer tunnels. The laboratory plan would utilize these two tunnels to produce a laboratory that has many desirable features, including dedicated, clean, horizontal access, container-module transport, and low operations costs. Various aspects of the site help to reduce geotechnical, environmental, and safety risks.
Related Topics
Physical Sciences and Engineering
Physics and Astronomy
Nuclear and High Energy Physics