Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
1849490 | Nuclear Physics B - Proceedings Supplements | 2008 | 5 Pages |
In this report the overview of activity at existing and future electron-positron high energy colliders at BINP is presented. The operating machine is the VEPP-4M storage ring being run at the moment at its low energy (Tau and Charmonia region). The new collider VEPP-2000, based on round beams approach, for energy range from pion threshold up to 2 GeV was constructed and now is in commissioning stage. First luminosity 1⋅1031cm−2s−1 in 1+1 bunch mode at phi-meson energy was successfully achieved. At the moment, two detectors are in final preparation for data taking. The new e+e− injector complex VEPP-5 with production rate 1010 positrons per second was constructed to guarantee ultimate parameters of VEPP-2000 and VEPP-4M, and open prospects for future high luminosity e+e− collider(s). The VEPP-5 injector complex is in commissioning phase now. First electrons accelerated up to 300 MeV are stored in the damping ring. The active R&D and civil construction efforts are aimed to the Tau/Charm Factory with luminosity 1035cm−2s−1 and longitudinal polarization.