Article ID Journal Published Year Pages File Type
1849918 Nuclear Physics B - Proceedings Supplements 2006 5 Pages PDF
Abstract

The production for the endcap RPCs in the CMS experiment has entered a mature stage of the production stream. In this paper, the production facilities and the selection procedures of the qualified RPC gaps are presented. The mass production and the quality control tests for the endcap RPCs have reached the maximum productivity. The yield to produce the qualified gaps is now above 80 % of the qualified bakelite sheets provided by Italy. We also report an intensive aging study for the endcap RPCs performed by using a 200 mCi 137Cs gamma-ray source. A few diagnostic methods to observe aging phenomena are discussed. The test result is equivalent to approximately 12 years of Compact Muon Solenoid (CMS) RPC operation.

Related Topics
Physical Sciences and Engineering Physics and Astronomy Nuclear and High Energy Physics