Article ID Journal Published Year Pages File Type
242689 Applied Energy 2014 11 Pages PDF
Abstract

•A novel operation strategy based on minimum distance which is flexible and adaptable was proposed.•An integrated evaluation criterion reflecting the matching performance was presented.•The strategy and criterion was used to optimize the design of the CCHP system.

A novel operation strategy based on minimum distance was proposed. Also, an integrated evaluation criterion which can reflect the matching performance between the CCHP (combined cooling, heating and power) system and the building was presented. A hospital in Shanghai was used to evaluate the CCHP system with the proposed strategy using the proposed evaluation criterion. The proposed operation strategy was compared with FEL (following the electric load), FTL (following the thermal load) and FHL (following hybrid electric-thermal load) strategies. The results show that the matching performance evaluation criterion is reasonable and integrated. The system with a better matching performance would be fully used and maintain high efficiency. Compared with FEL, FTL and FHL strategies, the proposed operation strategy is flexible and adaptable, which can lead to a better matching performance for a CCHP system. In the case study, the optimized power generation unit capacity and weightings of the optimized operation strategy are 900 kW and w1,above equals to 0.4, w1,below equals to 0.1, respectively.

Graphical abstractFigure optionsDownload full-size imageDownload as PowerPoint slide

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,