Article ID Journal Published Year Pages File Type
243818 Applied Energy 2011 15 Pages PDF
Abstract

Organic Rankine Cycle (ORC) is a promising technology for converting the low-grade energy to electricity. This paper presents an investigation on the parameter optimization and performance comparison of the fluids in subcritical ORC and transcritical power cycle in low-temperature (i.e. 80–100 °C) binary geothermal power system. The optimization procedure was conducted with a simulation program written in Matlab using five indicators: thermal efficiency, exergy efficiency, recovery efficiency, heat exchanger area per unit power output (APR) and the levelized energy cost (LEC). With the given heat source and heat sink conditions, performances of the working fluids were evaluated and compared under their optimized internal operation parameters. The optimum cycle design and the corresponding operation parameters were provided simultaneously. The results indicate that the choice of working fluid varies the objective function and the value of the optimized operation parameters are not all the same for different indicators. R123 in subcritical ORC system yields the highest thermal efficiency and exergy efficiency of 11.1% and 54.1%, respectively. Although the thermal efficiency and exergy efficiency of R125 in transcritical cycle is 46.4% and 20% lower than that of R123 in subcritical ORC, it provides 20.7% larger recovery efficiency. And the LEC value is relatively low. Moreover, 22032L petroleum is saved and 74,019 kg CO2 is reduced per year when the LEC value is used as the objective function. In conclusion, R125 in transcritical power cycle shows excellent economic and environmental performance and can maximize utilization of the geothermal. It is preferable for the low-temperature geothermal ORC system. R41 also exhibits favorable performance except for its flammability.

Research highlights▸ We conduct the thermodynamic and economic performance comparison of the fluids in both subcritical ORC and transcritical power cycle. ▸ We perform parameter optimization based on five indicators. ▸ The optimum operation parameters and working fluids are not the same for different indicators. ▸ The LEC value is used as the determining factor for fluids screening. ▸ The transcritical power cycle with R125 as the working fluid was a cost-effective approach.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,