Article ID Journal Published Year Pages File Type
247558 Automation in Construction 2006 9 Pages PDF
Abstract

Most high-rise building construction projects rely on tower cranes to perform lifting and hoisting activities. In practice, tower cranes are managed based on demand, urgency, and prioritized work tasks that must be performed within a set period of time in the field. As a computer tool, simulation has proved to be effective in modeling complex construction operations and can be a substantial help in aiding practitioners in construction planning. However, the use of simulation has fallen far below its maximum potential due to a lack of appropriate support tools which would allow construction managers to use simulation tools for themselves. Special purpose simulation (SPS) and 3D visualization of simulated operations are two potential means that enable domain experts, who are knowledgeable in give domains, but not familiar with simulation, to easily model an operation within their domain and analyze the simulation results. This paper presents a practical methodology for integrating 3D visualization with SPS for tower crane operation. An integrated system was built in a 3D Studio MAX environment and tested in the construction of the new civil and environmental engineering building at the University of Alberta. This paper demonstrates that 3D visualization is helpful in the verification and validation of simulation results, and can effectively communicate the essence of a simulated operation, thus improving the accessibility of simulation as a decision making aid.

Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, , , ,