Article ID Journal Published Year Pages File Type
383663 Expert Systems with Applications 2012 6 Pages PDF
Abstract

Based on Genetic Algorithm (GA) and Grouping Genetic Algorithm (GGA), this research develops a scheduling algorithm for job shop scheduling problem with parallel machines and reentrant process. This algorithm consists of two major modules: machine selection module (MSM) and operation scheduling module (OSM). MSM helps an operation to select one of the parallel machines to process it. OSM is then used to arrange the sequences of all operations assigned to each machine. A real weapon production factory is used as a case study to evaluate the performance of the proposed algorithm. Due to the high penalty of late delivery in military orders and high cost of equipment investment, total tardiness, total machine idle time and makespan are important performance measures used in this study. Based on the design of experiments, the parameters setting for GA and GGA are identified. Simulation results demonstrate that MSM and OSM respectively using GGA and GA outperform current methods used in practice.

► This research uses Genetic Algorithm to solve flexible job shop scheduling problem. ► This algorithm includes machine selection module and operation scheduling module. ► A real factory is used as a case study for performance evaluation. ► The proposed algorithm outperforms current methods used in practice.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, , , ,