Article ID Journal Published Year Pages File Type
385881 Expert Systems with Applications 2011 12 Pages PDF
Abstract

In this paper, we focus on the vendor selection problem (VSP) for material supply in large-scale water conservancy and hydropower construction projects, and establish a corresponding model to solve this problem. After stating the problem, we introduce some basic knowledge of level-2 fuzzy sets and the way to transform them to normal fuzzy sets. Then we use the CCP model to handle the bifuzzy objective functions and constraints, based on a series of preparations, we transform the multi-objective integer model under bifuzzy environment into a deterministic model, then use particle swarm optimization (PSO) to solve this problem. The model is illustrated with an actual application to construction material supply.

Research highlights► We model the vendor selection problem in a bifuzzy environment. ► We use chance-constrained programming to get the crisp model. ► PSO is used to solve this problem. ► The application shows that the proposed model is effective. ► Analysis shows that the parameters’ values may affect the results.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, ,