Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
385881 | Expert Systems with Applications | 2011 | 12 Pages |
In this paper, we focus on the vendor selection problem (VSP) for material supply in large-scale water conservancy and hydropower construction projects, and establish a corresponding model to solve this problem. After stating the problem, we introduce some basic knowledge of level-2 fuzzy sets and the way to transform them to normal fuzzy sets. Then we use the CCP model to handle the bifuzzy objective functions and constraints, based on a series of preparations, we transform the multi-objective integer model under bifuzzy environment into a deterministic model, then use particle swarm optimization (PSO) to solve this problem. The model is illustrated with an actual application to construction material supply.
Research highlights► We model the vendor selection problem in a bifuzzy environment. ► We use chance-constrained programming to get the crisp model. ► PSO is used to solve this problem. ► The application shows that the proposed model is effective. ► Analysis shows that the parameters’ values may affect the results.