Article ID Journal Published Year Pages File Type
394025 Information Sciences 2013 10 Pages PDF
Abstract

This paper proposes a new heuristic method for the general flowshop scheduling problem with the due dates and the sequence dependent setup times (SDSTs) where the objective is to minimize the total weighted tardiness. The approach consists of two phases: in the first phase, a permutation sequence is obtained and this sequence is then improved by a non-permutation local search in the next phase. Using some well-known standard benchmark problems, we examine the performance of the proposed algorithm and our computational results indicate that, despite its simplicity, the proposed heuristic approach provides better solutions than some other alternative methods.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
,