Article ID Journal Published Year Pages File Type
399041 International Journal of Electrical Power & Energy Systems 2009 8 Pages PDF
Abstract

Both the coordination of international energy transfer and the integration of a rapidly growing number of decentralized energy resources (DER) throughout most countries cause novel problems for avoiding voltage band violations and line overloads. Traditional approaches are typically based on global off-line scheduling under globally available information and rely on iterative procedures that can guarantee neither convergence nor execution time. In this paper, we focus on operational limitation problems in power grids based on widely dispersed (renewable) energy sources. We introduce an extension to the DEZENT algorithm, a multi-agent based coordination system for DER, that allows for the feasibility verification in constant and predetermined time. We give a numerical example showing the legitimacy of our approach and mention ongoing and future work regarding its implementation and utilization.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, , , , ,