Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
399850 | International Journal of Electrical Power & Energy Systems | 2013 | 8 Pages |
An iterative based strategy is proposed for finding the optimal rating and location of fixed and switched capacitors in distribution networks. The substation Load Tap Changer tap is also set during this procedure. A Modified Discrete Particle Swarm Optimization is employed in the proposed strategy. The objective function is composed of the distribution line loss cost and the capacitors investment cost. The line loss is calculated using estimation of the load duration curve to multiple levels. The constraints are the bus voltage and the feeder current which should be maintained within their standard range.For validation of the proposed method, two case studies are tested. The first case study is the semi-urban 37-bus distribution system which is connected at bus 2 of the Roy Billinton Test System which is located in the secondary side of a 33/11 kV distribution substation. The second case is a 33 kV distribution network based on the modification of the 18-bus IEEE distribution system. The results are compared with prior publications to illustrate the accuracy of the proposed strategy.
► A new strategy is proposed for optimal planning of fixed and switched capacitors. ► A Modified Discrete Particle Swarm Optimization is employed in the proposed strategy. ► The objective is to minimize the line loss cost and the capacitor investment cost.