Article ID Journal Published Year Pages File Type
400179 International Journal of Electrical Power & Energy Systems 2007 8 Pages PDF
Abstract

This paper introduces the scheduling method for thermal and energy storage system (ESS) unit commitment. The ESS is incorporated to achieve peak load-levelling and reduce the total cost. The thermal scheduling is implemented by the extended priority list (EPL) method. The EPL method consists of two steps, in the first step we get rapidly some initial unit commitment schedules by the priority list (PL) method. In this step, operational constraints are disregarded. In the second step, unit schedules are modified using the problem specific heuristics to fulfill operational constraints and to reduce the total cost. To calculate efficiently, heuristics are only applied to solutions which can be expected improvement. The ramp constraints for thermal unit are considered at the last of EPL method. The ESS scheduling is carried out based on the thermal unit schedule obtained by the EPL method. Several numerical examples demonstrate the effectiveness of the proposed method.

Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, , , , ,