Article ID Journal Published Year Pages File Type
473934 Computers & Operations Research 2009 4 Pages PDF
Abstract

Following several recent papers discussing various problems of scheduling a maintenance activity, we focus here on scheduling a maintenance activity on unrelated parallel machines. The objective is to minimize flow-time. In the basic setting, we assume that all the machines must be maintained simultaneously. The problem is known to be NP-hard, and we introduce and test numerically an efficient heuristic and a lower bound, both based on a solution of a matching problem. We also study the relaxed version, where the machines are not restricted to be maintained at the same time. Similar heuristic and lower bound are proposed and tested.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,