Article ID Journal Published Year Pages File Type
474728 Computers & Operations Research 2011 7 Pages PDF
Abstract

In this paper, we consider an identical parallel machine scheduling problem with sequence-dependent setup times and job release dates. An improved iterated greedy heuristic with a sinking temperature is presented to minimize the maximum lateness. To verify the developed heuristic, computational experiments are conducted on a well-known benchmark problem data set. The experimental results show that the proposed heuristic outperforms the basic iterated greedy heuristic and the state-of-art algorithms on the same benchmark problem data set. It is believed that this improved approach will also be helpful for other applications.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,