Article ID Journal Published Year Pages File Type
474837 Computers & Operations Research 2009 18 Pages PDF
Abstract

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,