4752093 Biochemical Engineering Journal 2017 8 Pages PDF
Abstract

•The first full-scale anammox plant using gel carrier was successfully operated.•Ammonia plant effluent contained ammonium with methanol, an anammox inhibitor.•The start-up time of the nitritation and anammox reactors was 3 weeks and 2 months.•Stable nitritation and anammox performance was observed for >1 year.•The average total nitrogen removal on the anammox reactor was 330 kg-N/d.

The first full-scale nitritation-anammox process using gel entrapment technology was evaluated for nitrogen removal. Ammonia plant effluents contained not only ammonium but also methanol, an anammox inhibitor. The nitrogen concentration and loading design were 690 mg/L and 400 kg-N/d, respectively. A nitritation reactor (170 m3) filled with nitrification gel carriers was started up on day 20, with a resulting nitrification efficiency of 58%. A stable nitritation performance was observed without significant nitrate production for >1 year. A nitrogen conversion rate of 3.2 kg-N/m3/d was observed on the anammox reactor (100 m3) filled with anammox gel carrier on day 69. The full-scale anammox reactor could be started up in approximately 2 months. Subsequently, stable nitrogen removal performance was observed for >1 year. The average nitrogen loading, nitrogen conversion rate, and total nitrogen removal on the anammox reactor were 3.6 kg-N/m3/d, 3.0 kg-N/m3/d and 330 kg-N/d, respectively. The nitrogen removal performance obtained in this study will facilitate further application of the anammox processes to many types of industrial wastewater treatment.

Graphical abstractDownload high-res image (272KB)Download full-size image

Related Topics
Physical Sciences and Engineering Chemical Engineering Bioengineering
Authors
, , , , ,