Article ID Journal Published Year Pages File Type
475257 Computers & Operations Research 2010 13 Pages PDF
Abstract

In this paper, we consider the recovery of an airline schedule after an unforeseen event called disruption, making the planned schedule infeasible. We present a modeling framework that allows the consideration of operational constraints within a Column Generation (CG) scheme. We introduce the general concept of recovery network, generated for each individual unit of the problem, and show how unit-specific constraints are modeled using resources. We fully illustrate the concept by solving the Aircraft Recovery Problem (ARP) with maintenance planning, we give some insights into applying the model to the Passenger Recovery Problem (PRP) and we present computational results on real data.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,