Article ID Journal Published Year Pages File Type
476768 European Journal of Operational Research 2013 13 Pages PDF
Abstract

The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent setup times are considered. As setup times and multi-criteria problems are important in industry, we must focus on this area. We propose a simple, yet powerful algorithm for the sequence dependent setup times flowshop problem with several criteria. The presented method is referred to as Restarted Iterated Pareto Greedy or RIPG and is compared against the best performing approaches from the relevant literature. Comprehensive computational and statistical analyses are carried out in order to demonstrate that the proposed RIPG method clearly outperforms all other algorithms and, as a consequence, it is a state-of-art method for this important and practical scheduling problem.

► We study the multi-objective PFSP with setup times problem. ► Review state of the art on the problem and propose a new benchmark and new algorithm. ► Obtained state of the art results for the proposed benchmark.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,