Article ID Journal Published Year Pages File Type
476900 European Journal of Operational Research 2012 11 Pages PDF
Abstract

Performance based contracting (PBC) emerges as a new after-sales service practice to support the operation and maintenance of capital equipment or systems. Under the PBC framework, the goal of the study is to increase the system operational availability while minimizing the logistics footprint through the design for reliability. We consider the situation where the number of installed systems randomly increases over the planning horizon, resulting in a non-stationary maintenance and repair demand. Renewal equation and Poisson process are used to estimate the aggregate fleet failures. We propose a dynamic stocking policy that adaptively replenishes the inventory to meet the time-varying parts demand. An optimization model is formulated and solved under a multi-phase adaptive inventory control policy. The study provides theoretical insights into the performance-driven service operation in the context of changing system fleet size due to new installations. Trade-offs between reliability design and inventory level are examined and compared in various shipment scenarios. Numerical examples drawn from semiconductor equipment industry are used to demonstrate the applicability and the performance of the proposed method.

► Planning reliability and spare parts logistics for performance based service contract. ► Forecasting spare part demands for a stochastically increasing system fleet. ► An adaptive inventory policy is devised to meet the non-stationary demand. ► Reliability and stocking level are optimized using heuristic algorithms.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,