Article ID Journal Published Year Pages File Type
477341 European Journal of Operational Research 2009 7 Pages PDF
Abstract

This paper addresses issues relating to off-line inspection with rework consideration. We develop a mathematical model to determine the first unit inspected and the average number to be inspected in a batch, assuming the involvement of a quality-control department with a standard procedure. Numerical analyses are used to simulate the effect of changes in the various parameters on the optimal solution when the probability of a transition between states follows the discrete Weibull distribution.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,