Article ID Journal Published Year Pages File Type
477994 European Journal of Operational Research 2006 10 Pages PDF
Abstract

In this paper, we consider the non-central chi-square chart with two stage samplings. During the first stage, one item of the sample is inspected and, depending on the result, the sampling is either interrupted, or it goes on to the second stage, where the remaining sample items are inspected and the non-central chi-square statistic is computed. The proposed chart is not only more sensitive than the joint X¯ and R charts, but operationally simpler too, particularly when appropriate devices, such as go-no-go gauges, can be used to decide if the sampling should go on to the second stage or not.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,