Article ID Journal Published Year Pages File Type
478199 European Journal of Operational Research 2014 8 Pages PDF
Abstract

•Examine a two-machine flowshop scheduling problem with deteriorating jobs.•Minimize the total completion time subject to minimum makespan.•Propose a mixed integer programming and branch-and-bound algorithm for the problem.•Discuss dominant conditions and several polynomial-time solvable special cases.•Examine the effectiveness and efficiency of the proposed algorithms.

We study a two-machine flowshop scheduling problem with time-dependent deteriorating jobs, i.e. the processing times of jobs are an increasing function of their starting time. The objective is to minimize the total completion time subject to minimum makespan. We propose a mixed integer programming model, and develop two pairwise interchange algorithms and a branch-and-bound procedure to solve the problem while using several dominance conditions to limit the size of the search tree. Several polynomial-time solvable special cases are discussed. Finally, numerical studies are performed to examine the effectiveness and the efficiency of the proposed algorithms.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,