Article ID Journal Published Year Pages File Type
478465 European Journal of Operational Research 2011 10 Pages PDF
Abstract

Real world manufacturing systems are usually constrained by both machine and human resources. Human operators are often the constraining resource and transfer between workstations to process jobs when required. This kind of system is known as a Dual Resource Constrained (DRC) system and presents additional technical challenges which must be considered during planning and scheduling. These technical challenges can be categorised into the five main dimensions of job release mechanisms, job dispatching, worker flexibility, worker assignment and transfer costs. This paper aims to provide an overview of recent developments in DRC research concerned with each of these areas and also discusses some possible approaches to solving the resource scheduling problem in a DRC system. The focus is on materials published after 1995 and up to 2009. Previous reviews on DRC systems are commented on and followed by a review of recent works associated with each of the five dimensions of DRC system research. Advancements made and new methodologies proposed are discussed and future research directions are identified.

► Dual resource constrained manufacturing systems are difficult to deal with. ► Challenges are job release mechanisms and dispatching, worker flexibility, etc. ► DRC research is reviewed and possible approaches are suggested.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , ,