Article ID Journal Published Year Pages File Type
478529 European Journal of Operational Research 2011 19 Pages PDF
Abstract

In this manuscript, we present a formulation for the MMSP-W (Mixed model sequencing problem with workload minimisation) for production lines with serial workstations. We demonstrate the validity of the basic models in the presence of a control system on the production line that allows the stopping of operations with no restrictions. We propose an extension of the basic models that allows conditioned interruption of operations to facilitate line management. We then propose a procedure to solve the proposed problem through BDP (Bounded Dynamic Programming), and demonstrate its validity through a computational experiment with reference instances and a case study linked to the Nissan powertrain plant in Barcelona.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,