Article ID Journal Published Year Pages File Type
480796 European Journal of Operational Research 2010 9 Pages PDF
Abstract

We consider a scheduling problem in which n jobs are to be processed on a single machine. The jobs are processed in batches and the processing time of each job is a simple linear function of its waiting time, i.e., the time between the start of the processing of the batch to which the job belongs and the start of the processing of the job. The objective is to minimize the makespan, i.e., the completion time of the last job. We first show that the problem is strongly NP-hard. Then we show that, if the number of batches is B  , the problem remains strongly NP-hard when B⩽UB⩽U for a variable U⩾2U⩾2 or B⩾UB⩾U for any constant U⩾2U⩾2. For the case of B⩽UB⩽U, we present a dynamic programming algorithm that runs in pseudo-polynomial time and a fully polynomial time approximation scheme (FPTAS) for any constant U⩾2U⩾2. Furthermore, we provide an optimal linear time algorithm for the special case where the jobs are subject to a linear precedence constraint, which subsumes the case where all the job growth rates are equal.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,