Article ID Journal Published Year Pages File Type
480897 European Journal of Operational Research 2009 7 Pages PDF
Abstract

The makespan minimization problem in flow shops with no-idle constraints on machines is considered. The latter means that each machine, once started, must process all its operations without intermediate idle time until all those operations are completed. The problem is known to be strongly NP-hard already for three machines. While being based on a geometrical approach, we propose several polynomial time heuristics (for the general case and for special cases of 3 and 4 machines) which provide asymptotically optimal solutions for the increasing number of jobs. A comprehensive review of relevant results is also presented.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,